NRC vs STC: What Importers Should Actually Check on Acoustic Panels
NRC and STC measure two different things. Buyers who quote one number for both end up with panels that block sound but leave the yard loud — or vice versa.
Sound Barriers, Built to Block Noise.
Practical articles for overseas buyers and contractors: what noise barriers cost to import, how the constructions differ, which figures to specify, how the goods ship, and how to tell a real factory from a trading office.
NRC and STC measure two different things. Buyers who quote one number for both end up with panels that block sound but leave the yard loud — or vice versa.
Reflective, absorptive, transparent and louvre barriers solve different problems. Choosing wrong costs freight, or worse, a community complaint two months after handover.
About these guides. We manufacture and export the acoustic products described here, with English drawings and batch documentation. Installation and civil works are executed by your own contractor. Questions on any article? Ask the export desk — on call 24/7 (GMT+8).
13-year acoustic product manufacturer · Manufactured, tested and shipped from one factory
Own factory with 5,000㎡ daily capacity — galvanized steel, aluminum and acoustic panels all produced in-house. No middlemen, no markups.
Send your drawings or noise data and our engineers return a barrier cross-section, an insertion-loss estimate and a bill of materials in English — before any steel is cut.
Slitting, punching, roll forming, galvanizing, powder coating, panel assembly and mounting hardware all under one roof, so posts and panels always match and one order carries one quality standard.
Products delivered across China and shipped to Southeast Asia, the Middle East and Africa — highway and railway barriers, community screens, acoustic panels, silencers and louvres.
Composite barrier noise reduction of 10–25dB(A) and NRC ≥ 0.85 on 80 mm absorptive cores. Laboratory test reports ship with the delivery so you can verify the figures yourself.
Material certificates, coating thickness records and acoustic test reports are issued for every production batch, ready for tender submission and site acceptance.
Post and foundation design is calculated against the wind pressure and seismic zone that apply on your site, using the code your project is approved under.
Standard configurations on stocked tooling ship in 7 to 15 days; double shifts are arranged for urgent projects.